top of page
Profile
Join date: Jun 4, 2026
Posts (45)
May 27, 2026 ∙ 2 min
Piha House
Products Used: Nuraply 3PM, Flat Enertherm PIR, Nuralite Fixing plates Architect: Sang Architects Developer: Bruyere Limited Contractor: Gallagher Waterproofing Situation The Piha House project, completed in 2022, is a high-performance residential retrofit designed by Sang Architects and developed by Terry Bryers. The project was reimagined around Passive House principles to deliver exceptional thermal efficiency, durability, and occupant wellbeing. The building envelope incorporates...
2
0
May 17, 2026 ∙ 1 min
Umbra Lux: Achieving Thermal Efficiency and Unobstructed Views in Wanaka
Product used: Nuralite 3PM Warm Roof System, Nurajack Contractor: Dunlop Builders Architects: Eliška Lewis Architects Ltd Situation The Umbra Lux project in Wanaka is a contemporary residential home designed by Eliška Lewis Architects Ltd and constructed by Dunlop Builders. With its upper-level living spaces overlooking Lake Wanaka, the design required uninterrupted views and external decks while maintaining high thermal efficiency and durability. Challenge To preserve the stunning...
0
0
May 14, 2026 ∙ 2 min
Hamilton Office Building
Products Used: Nuraply 3PM Warm Roof System, Enertherm PIR Insulation Board, Dimond Advanced Roofing System (DARS) Architect: Sheppard & Rout Architects Contractor: Foster Construction Situation Sheppard & Rout Architects designed this project to support the client’s continued growth, providing additional administrative space and a new head office with dedicated client meeting areas. The existing premises had become inadequate, driving the need for a purpose-built facility tailored to the...
0
0
bottom of page

